Deal Evaluation Scorecard | TerraPro Solutions

Deal Evaluation Scorecard

Rate any power project on fatal flaw risk in 15 minutes

๐Ÿ“Š How to Use This Scorecard

  • Score each factor 1-10: 10=Perfect, 7-9=Good, 4-6=Concerning, 1-3=Red Flag
  • Be honest: Score what you KNOW, not what you hope
  • Watch totals: They calculate automatically as you type
  • Check interpretation: Your score will show green/yellow/red guidance
CATEGORY 1: TITLE & OWNERSHIP
0 / 40
1. TITLE CLARITY
Has comprehensive title examination been completed?
10: Full title examination complete, title insurance obtained
7-9: Preliminary review complete, minor issues with clear resolution path
4-6: Desktop review only, some concerns not fully investigated
1-3: No title work done or known defects with uncertain resolution
2. CHAIN OF TITLE INTEGRITY
Is the chain of title complete with no gaps?
10: Unbroken chain 60+ years, all recordings verified
7-9: Chain complete with minor gaps easily resolvable
4-6: Gaps requiring curative work
1-3: Significant gaps or competing claims
3. MINERAL RIGHTS STATUS
Are mineral rights addressed and secured?
10: Mineral rights owned or non-disturbance agreements in place
7-9: Severed but limited owners (1-5), acquisition in progress
4-6: Severed with 6-15 owners, or status unknown
1-3: 15+ fractional owners or active mining/drilling
4. ACCESS RIGHTS
Is legal access documented and enforceable?
10: Fee simple or recorded permanent easements
7-9: Access in negotiation with path to permanent
4-6: Informal agreement or unrecorded
1-3: No legal access or landlocked
CATEGORY 2: ENVIRONMENTAL & SITE
0 / 40
5. ENVIRONMENTAL STATUS
Has environmental due diligence been completed?
10: Phase 1 & 2 complete, no contamination
7-9: Phase 1 complete, minor concerns with mitigation plan
4-6: Phase 1 only but Phase 2 needed
1-3: No work done or significant contamination
6.PROTECTED SPECIES
Are there endangered species concerns?
10: Desktop screening complete, no protected species
7-9: Species present but avoidance feasible
4-6: Species likely present, surveys not conducted
1-3: Listed species confirmed or take permit required
7.WETLANDS & WATER FEATURES
Are there wetlands or water issues?
10: No wetlands or all Section 404 permits secured
7-9: Wetlands present but impact avoidable
4-6: Wetlands present, permitting required but not initiated
1-3: Significant wetlands with uncertain permit outcome
8.GEOTECHNICAL/SITE CONDITIONS
Is the site suitable for construction?
10: Geotechnical studies complete, suitable conditions
7-9: Desktop assessment favorable, confirmatory needed
4-6: Unknown conditions or minor concerns
1-3: Known unsuitable conditions (flooding, slope, soil)
CATEGORY 3: PERMITTING & APPROVALS
0 / 30
9.ZONING COMPLIANCE
Does zoning allow this project type?
10: Project permitted by-right, no variance needed
7-9: Conditional use permit required, precedent exists
4-6: Zoning unclear, variance or rezoning needed
1-3: Project type prohibited or extremely difficult
10.PERMIT PATHWAY
Are all required permits identified?
10: Complete permit matrix, agencies consulted
7-9: Major permits identified, preliminary discussions held
4-6: Requirements generally understood but not mapped
1-3: Requirements unknown or permits likely impossible
11.COMMUNITY & POLITICAL
What's the community sentiment?
10: Strong community support, no opposition
7-9: Generally positive, some concerns manageable
4-6: Mixed sentiment, political landscape uncertain
1-3: Organized opposition or hostile local government
CATEGORY 4: TECHNICAL & ECONOMIC
0 / 40
12.INTERCONNECTION/OFFTAKE
Is grid connection or offtake secured?
10: Interconnection agreement signed or offtake executed
7-9: Study complete with favorable results
4-6: Queue position secured but study not complete
1-3: No position or uncertain grid capacity
13.RESOURCE/FUEL
Is energy resource adequate and secure?
10: Resource thoroughly characterized, supply contracts in place
7-9: Resource adequacy confirmed through studies
4-6: Resource assumed adequate but not verified
1-3: Resource uncertain or inadequate
14.PROJECT ECONOMICS
Do economics work with realistic assumptions?
10: Comprehensive model with conservative assumptions
7-9: Model developed, adequate returns with reasonable assumptions
4-6: Economics uncertain, dependent on optimistic assumptions
1-3: Economics marginal even with best-case assumptions
15.DEVELOPMENT TIMELINE
Is the timeline realistic?
10: Detailed Gantt chart, critical path identified, buffers included
7-9: Timeline with major milestones, generally realistic
4-6: High-level timeline or aggressive schedule
1-3: Timeline unrealistic or not developed
YOUR TOTAL SCORE
0
out of 150 points

Enter scores to see interpretation

Score each of the 15 factors above to get your result.

๐Ÿ“ Notes & Follow-Up

Scored Below 120? Let's Talk.

Projects scoring below 120 have significant fatal flaw risk. Our desktop due diligence team can help you identify and resolve these issues before capital commitment.

โœ“ 2-4 week fatal flaw screening
โœ“ $75K-$400K investment vs. $3M-$50M+ losses
โœ“ Title, environmental, permitting & access expertise