Energy storage is growing at record speed. In Q1 2025, the U.S. added over 1.5 GW of utility-scale battery capacity — a 57% increase over last year. But as the market races ahead, many developers are stalling out.
Why?
Because the land file wasn’t ready.
Access rights weren’t secure. Easements were missing. Title defects weren’t cured. And when financing, permitting, or acquisition came knocking, the project failed — not because of tech, but because of title.
Battery storage projects face unique land challenges:
Small, high-value sites with precise siting needs
Critical grid interconnection locations
Increased regulatory and fire safety scrutiny
Fast-tracked timelines with no room for surprises
These factors make flawless land agreements and title review essential.
Assuming you can use an existing road or trench utilities without a recorded easement is one of the most common — and costly — errors.
Fix it:
✔ Secure and record all ingress/egress and utility easements
✔ Ensure title insurance covers these rights
✔ Verify boundaries on an ALTA survey
Developers often order title but don’t review it until weeks — or months — later. By then, you’ve lost precious time to resolve curative items like missing releases, breaks in chain, or unresolved liens.
Fix it:
✔ Review title as soon as it’s issued
✔ Assign curative responsibilities
✔ Track open requirements as part of development risk
Storage project success depends on control that lasts — and transfers. Poorly written leases or options without storage-specific language, assignability clauses, or long enough terms can be dealbreakers.
Fix it:
✔ Draft agreements that explicitly allow battery storage and substation use
✔ Include assignability and renewal provisions
✔ Confirm legal descriptions match parcel data and survey
Boundary issues, title exceptions, or encroachments can stall permitting and underwriting — and often go undetected until it’s too late.
Fix it:
✔ Order and review an ALTA survey early
✔ Cross-reference title, legal descriptions, and parcel maps
✔ Flag encroachments or unrecorded uses before permitting
A co-located storage project in California stalled for 6 months due to an access easement dispute with an adjacent parcel.
A developer in the Midwest lost a buyer mid-M&A because the site control didn’t clearly allow for storage-specific infrastructure.
The common theme? Land issues weren’t uncovered until the final mile.
Energy storage is critical to grid resilience and clean energy expansion. But no matter how innovative the tech, a weak land file still breaks projects.
If you’re not addressing title, easements, and site control from day one, you’re not developing — you’re gambling.